Aerzen USA insights and guidance for blower, compressor and vacuum pump applications

Aeration Blower Saves $44K Annually For Wastewater Treatment Plant

Posted by Aerzen At Aerzen USA on Mon, May 06, 2013 @ 04:38 PM

The segment from WaterOnline Radio features interviews with John Franz, wastewater treatment plant manager for the City of Anacortes, WA, as well as Kevin Grant, a regional sales manager for Aerzen USA.

Read More

Tags: Aerzen, positive displacement, rotating equipment, Aerzen USA, pd blower, rotary lobe blower, turbo blowers, blower sizing, wastwater, water treatment, WWTP, aeration

A Turbo Blower for the Base Load, PD Blower for the Peak Load

Posted by Tom McCurdy on Mon, Apr 15, 2013 @ 10:27 AM

A biological municipal wastewater treatment plant with a considerably fluctuating discharge quantity can only perform its function with utmost energy efficiency and reliability if the process air consumption of the aeration basin can be adjusted continuously and is fully automated in order to deal with widely fluctuating load quantities. The example of the wastewater treatment plant shows how this is achieved with the use of a speed controlled Aerzen turbo blower.

Read More

Tags: Aerzen, positive displacement, rotating equipment, Aerzen USA, pd blower, turbo blowers, blower sizing, wastwater, water treatment, WWTP, aeration

How To Choose The Right Blower For Wastewater Treatment (Podcast)

Posted by Tom McCurdy on Thu, Nov 08, 2012 @ 10:53 AM

Three main blower technologies are condsidered for waste water treatment applications:

Read More

Tags: Aerzen, positive displacement, Aerzen USA, pd blower, rotary lobe blower, turbo blowers, blower sizing, wastwater, water treatment, WWTP, aeration

An Engineer's Mini-Guide To Blower Technology Selection

Posted by Ralph Wilton on Mon, Oct 22, 2012 @ 03:35 PM

Turbo Blowers. Positive Displacement Blowers. Hybrid Rotary Lobe Blowers. Which one should you choose for your wastewater treatement application? How much energy can you really save? Who can you trust to give you an objective answer? The best place to start is by downloading the Engineer's Mini-Guide To Blower Technology Selection.

Read More

Tags: Aerzen, positive displacement, compressors, Aerzen USA, pd blower, rotary lobe blower, turbo blowers, blower sizing, wastwater, water treatment, WWTP

Real-time Condition Monitoring For Blowers And Compressors

Posted by Inquires At Aerzen US on Mon, Jun 25, 2012 @ 09:21 AM

The Aerzen iAir Remote Monitoring System (RMS) is a comprehensive monitor that can be attached to any blower or compressor to capture real-time activities and conditions. Based on industrial cellular technology, the RMS can function in any location with cellphone coverage for both indoor and outdoor applications. The system is easily installed and linked directly to your cell phone for up-to-the-minute condition reports and notifications. This allows for peace of mind and troubleshooting when you are not accessible to the equipment.

Read More

Tags: Aerzen, positive displacement, Aerzen USA, pd blower, rotary lobe blower, pneumatic conveying

Operating Time Versus Condition Based Oil Changes

Posted by Ralf Weiser on Mon, Jun 20, 2011 @ 02:48 PM

The majority of all operating manuals provide the equipment user with a time based plan when to change the machine’s oil.  This interval is typically designed to protect the oil and subsequently the machine from breaking down prematurely in most if not all operating conditions.  So far so good.  This comes with a price tag as the machine needs to be properly shut down and locked / tagged out.  Besides of the obvious cost for the lubricant you also incur labor and potential production down time cost.  For most of the smaller machines requiring less than a gallon of oil for each change it may not make sense to go with a condition based lubricant change.  Experts fix what needs fixing and this applies here also.  For larger quantities it may make much more sense to go with an oil condition based oil change schedule. 

Read More

Tags: Aerzen, positive displacement, screw compressor, Aerzen USA, pd blower, turbo blowers, wastwater

Making A Shop Air Compressor Green(er)

Posted by Ralf Weiser on Thu, Jun 02, 2011 @ 09:49 AM

Plant air is a known energy sink and you may not think of a shop air compressor as an area that can be made more sustainable.  At Aerzen’s LEED certified facility in Coatesville we initially were not able to improve upon old concepts at first either.  During the course of the last three years we were able to make significant changes to reduce its environmental impact. Adding an electronic controller, variable speed drive, remote monitoring and recycling waste heat did a fantastic job reducing the carbon foot print of the compressed air system.  They are simple ideas that you can implement in one way shape or form.  Your bottom line may be affected by this more than you think. 

Read More

Tags: positive displacement, rotating equipment, compressors, screw compressor, oil-free screw process gas compressor, Aerzen USA, oil-flooded screw compressor, pneumatic conveying

Top 5 Questions To Ask When Sizing A Blower System With A Vacuum Pump

Posted by Bruce Impey on Sun, May 22, 2011 @ 06:22 PM

In order to properly size a blower system with a vacuum pump, there are five main requirements to consider:

Read More

Tags: Aerzen, positive displacement, rotating equipment, screw compressor, Aerzen USA, pd blower, rotary lobe blower, blower sizing

Lowering start-up power draw with across the line start - PD blower

Posted by Ralf Weiser on Mon, May 02, 2011 @ 04:36 PM

The most common motor start is what is commonly known as “across the line” (direct) motor start.  Power companies like when consumers do this as the resulting power draw (Amperage) spike is typically assessed with so called power demand charges on top of the regular power consumption charge in cents/kWh.  In any application where the blower or compressor must start against header pressure this starting method carries the greatest penalty as the motor must overcome the rotating equipment’s moment of inertia and the system pressure.  The graph below illustrates the power draw and the time it takes to bring the blower / compressor on line.  An Aerzen Aeromat automatic start-up unloading valve may be the answer to your problem. 

Read More

Tags: positive displacement, Aerzen USA, pd blower, rotary lobe blower, blower sizing

Of Pipework And Other Surprises During Blower And Compressor Start-up

Posted by Ralf Weiser on Mon, Apr 11, 2011 @ 10:14 AM

Day of start-up is always an exciting time as all the long hard work of engineers and construction folks can finally show off what they have worked on for typically a long time.  Most focus is placed on equipment, infrastructure, controls and plant processes.  One item that is often underestimated in air and gas moving equipment is the pipe-work that connects primary air movers and the process.  Materials of construction, alignment, thermal growth allowance and most of all cleanliness continue to be one of the most unique challenges start-up engineers continue to encounter. 

Read More

Tags: positive displacement, rotating equipment, Aerzen USA, pd blower, rotary lobe blower, pneumatic conveying

Call to action will go here below

This is the content. This is demonstration text. Click 'edit' above to create your own content.